WATL Sunnybrook Substation

Our contract with Siemens for the site preparation and electrical installation which encompassed the erection of all steel and installation of all related equipment on site.

Excavation for the installation of underground cable for power distribution. Exposing, repairing and subsequent pressure testing of a damaged portion of the existing fire-water line. Repairs to the line included the careful removal of concrete casing so as to avoid causing additional harm to the undamaged portions of the waterline.

Continuing work scopes include bringing the site to sub-grade with client supplied material. This requires additional coordination efforts as up to 15 contractors can be on site each day. Additional work scopes yet to be completed include: the installation of geotextiles and environmental liners and we completing the drainage and final-grade scopes of work.

Project Details

  • Client: Altalink