Head Office (780) 436-9570

Projects

Back to Projects

Shell UE-1 Waterblock Electrical, Instrumentation & Commissioning

Work included the installation of:

  • Above grade grounding
  • All electrical equipment
  • Installation, termination, and testing of all electrical power, control, low voltage distribution, heat tracing and instrumentation cables
  • All related loop checks
Back to Projects