Enbridge Lynton Station Civil Contract

In order to correct drainage issues resulting in property and environmental damage, work included the installation of new earth-berms, culvert, concrete blocks, geotextile & enviro-liner materials along with the regrading of existing roads, swales and ditches. Earth-berms were covered in topsoil, slope textured and hydroseeded.

New construction on the brownfield site included the construction of a gravel pad for the Hazardous Material Storage building and the sub-base prep for the extension of concrete pad to support a new switchgear.  During construction Chemco was responsible for maintaining access for Enbridge Operations as well as providing site security.  Site Security included the installation of temporary construction fence (complete with locks) and hiring a security subcontractor.

Project Details

  • Total Man Hours: 5,532