ATCO Electric HRTD Project

Turnkey installation of three 240kV/144kV Stubstations for the Hanna Region Transmission Development Project.

Contract included:

All civil work:

  • Excavation
  • Pilings
  • Fencing
  • Foundations
  • Stripping – 45000 Cubic Meters
  • Common Excavation – 62000 Cubic Meters
  • Borrow Backfill – 123000 Cubic Meters
  • Geotextile supply and installation – 9000 square meters
  • Aggregate Supply and Installation – 53000 tons
  • Steel Driven Piles -280
  • Concrete Piles – 205
  • Concrete Oil Containment units
  • Fencing – 3000 linear meters

Installation of steel structures and installation of equipment:

  • Circuit breakers, disconnect switches
  • Surge arrestors, CVTS, CT’s, PT’s
  • Bussing
  • Outdoor lighting and receptacles
  • Transformers, capacitor
  • Control building

Completion of the project and start-up commissioning was also provided to operations and engineers.

Project Details

  • Manhours: 25,000